Preventive maintenance is a calendar problem
Planned tickets, seasonal cadences, and a budget for every visit: a practical way to start fixing things before they break.
Bruegel's harvesters aren't in a hurry. The wheat comes down in August because that's when it's ready. The hay is stacked before the rain, and lunch happens under a tree because there's still a long afternoon ahead. Everything has its time. Bruegel painted it all in 1565.
Reactive is also a schedule
Skip the maintenance calendar, and your equipment starts keeping one for you.
Three emergencies, and not one of them on the calendar. A breakdown picks the coldest week of the year, comes with an emergency callout premium, and takes the rest of your day hostage.
Move the work to your side of the calendar
Preventive maintenance starts with one decision, repeated: this asset, this task, every few weeks. In fam., that becomes a planned ticket with a schedule. Every visit is put on the calendar from the start, with everything needed to get the work done:
- Assignments: Set who's responsible on the planned ticket, whether that's an organization, team, or individual, along with the field operator or team going on-site.
- A checklist: Attach a checklist for the task. It's completed at check-out, turning "checked the boiler" into a record of actual answers.
- A budget: Set a budget for each visit. When a cost fits within the remaining budget, it's approved automatically. No one needs to hold things up.
- A record of every visit: Keep each visit's findings with it, so February knows exactly what June found.
Plans have to adapt to reality, so you can change an individual visit without disrupting the rest of the series. Cancel it, move it to another day, or adjust its budget before any costs on that visit are approved. The other visits stay on schedule.
Here's what that looks like on a ticket from our playground:
Some cadences are seasonal
The Harvesters is one panel in a series depicting the seasons. Bruegel painted the whole year, from sowing to snow. Your locations run on the same mix of rhythms.
Filters and lubrication need monthly attention. The roof should be checked before the first storm, the chillers before the first heat wave, and the gutters when the leaves come down. Whatever sets the interval, put it in the system that creates the work. The person who's done it longest will eventually change shifts.
Start with ten assets
Don't try to cover every location on day one. Pick the ten assets whose failure would hurt the most. Give each one a schedule and a checklist, then let the first quarter of records help you fine-tune the intervals.
The calendar pays for itself the first time a bearing gets replaced during a planned Tuesday maintenance visit instead of on a freezing February night.
Link each asset to its planned ticket, and the approved costs from every visit add up on that asset's record. When keeping it starts to cost more than replacing it, fam. marks it. Our CAFM software page explains how.
Artwork: Pieter Bruegel the Elder, The Harvesters, 1565. The Metropolitan Museum of Art, New York. Public domain.